⎝⎛大家玩棋牌⎞⎠

Welcome to the official website of Qingdao Luode General Machinery Equipment Co., Ltd.!

Order Online | Favorite Rhodes | Site Map
National Consulting Hotline 400-800-5717

青岛罗德通用机械设备有限公司

中石化、中石油、中海油长期供应商 Cam Rotor Pump Manufacturers Sinopec, PetroChina, CNOOC Long-term Supplier

罗德泵凭借卓越的性能,在石油市政化工码头造船轻工等诸多行业得到广泛应用
You are here: ⎝⎛大家玩棋牌⎞⎠ »» Road Information » FAQs » What operations need to be performed on the metal skeleton for rubber rotor pump rotor injection?

What operations need to be performed on the metal skeleton of the rubber rotor pump rotor injection?

查看手机网址 Editor-in-chief: Check the mobile website
scan it! 橡胶转子泵转子注胶需要对金属骨架做哪些操作? scan it!
发表时间:2020-01-13 09:35【 Popularity: -Published time: 2020-01-13 09:35 [Large Middle Small]

In the rubber rotor pump injection process, the treatment of the rotor metal skeleton is particularly important, which determines the stability of the rotor in the later use and the self-priming pressure that can be achieved. The main purpose of processing the metal skeleton in the glue injection process is to increase its adhesion. The main steps are as follows:

转子泵注胶

1. High temperature degreasing of the processed metal framework;

2. Sand blast on the surface in contact with the rotor;

3. Use a volatile solvent to clean the surface of the metal skeleton;

4. Glue after the metal frame has cooled, and then proceed to the next step after cooling.

In the overall processing of the metal skeleton, more details are required, and reasonable time control is especially important.

relevant information

    Qingdao Luode General Machinery Equipment Co., Ltd. Qingdao Luode General Machinery Equipment Co., Ltd. Record number: Lu ICP No. 13022300
    Phone: 0532-55576556 Fax: 0532-55576556
    Email: roeder001@163.com QQ: 3249598812
    Address: No. 3, First Road, Dongge Industrial Park, Chengyang District, Qingdao, Shandong Province

    Lu Gongwang Security No. 37021402000887

    欢乐拼三张 欢乐拼三张 七乐彩 天天电玩城